Toilet renovation: to Begin

The bathroom is an area with special states: high humidity, humidity differences. That is why making repairs in the restroom, you need to definitely plan the whole working process, to think about the sequence of steps to be achieved. Within the following article, you will learn the way to begin the repair in the restroom and what types of work ought to be carried out with your hands. Step-by-step instructions for bathroom repair

Phase 1: Establishing a strategy and picking a design solution.

Repair in the toilet can be of two types:

  • Unplanned, spontaneous, arising from the can of unexpected conditions. For example, in the event of an pipe burst, flooding by neighbors.
  • Planned, which is either capital or cosmetic. It requires preparation, serious monetary investment and time.

Begin repairs at the toilet is to ascertain the plan, interior. Think through to the last detail, what will be the room, choose a colour. Pastel colors are traditional, as well as a mixture of blue and blue, pink or cherry with beige.

Begin repairs at the toilet is to ascertain the design, interior layout. Consider detail, what’s going to be the space, select a color. Pastel colors are thought to be traditional, in addition to a combo of colours.

The next point is the option of facing substance. As a rule, finishing in the bathroom is done with tile, porcelain tiles, mosaicand plastic panels. Examine the pipes, whether it needs to be mended. If necessary, pick an appropriate alternative. Proceed to the measuring function: measure all sides, calculate the area of the area. Based on these information, we mark the location of the plumbing fittings.

Measure 2: the choice of sanitary fixtures and material for finishing.

It is necessary to recognize that the purchase price of sanitary ware simplifies the preparation stage, and not vice versa. This usually means that first we develop a new design project, create a plan, then go to the shop. Yet another point – you need to specify how big your favourite plumbing fittings and examine the program, whether it matches.

It is necessary to see that the cost of plumbing fixtures is completed by a preparation stage, and not vice versa. This usually means that first we create a design project, make a plan, and then go to the shop. Another one

As for stuff for completing, it’s preferable to buy them instantly for the entire repair cycle, in order that you will not be diverted if something has been missing. Do not forget about preparing the essential tools.

Step 3: dismantling plumbing and tiling.

Once All of the preliminary work has been completed, proceed to the beginning of the task process:

  • Remove the sink and tub from the area, even if they won’t be replaced with fresh ones. This way, you may keep them intact and clean.
  • Remove the tile, cleaning after it all of surfaces: ceiling, walls, floor.
  • Remove paint from the walls, if they were previously painted, vsyakuhnya.ru because the adhesive alternative or a new layer of paint won’t adhere to surface.

Measure 4: replacement of communications: pipes, electrical wiring.

Very often in an older home, you ought to carefully inspect and replace not only the pipes which are in the toilet itself, but also the major riser, and at times the interfloor pipes. What’s it worth doing this? Old pipes anytime may give a leak, and then the new fix will be spoiled, it is going to call for additional investment to eliminate flaws.